Mark Pickard
Today’s work added 1) a supply line shutoff at the house (built in 1964) which we never had (very convenient!); 2) in master bathroom, replaced old tub/shower trim with oil-rubbed bronze finishes to match sink, mirror & light fixture (very nice upgrade!); 3) installed positive shutoff valves to the clothes washer (no more drips). Gabe & Dante kept us apprised of the progress on each project & upon completion explained operations of changes. Work areas were all tidied up before their departure. Very pleased with the results! Thanks guys!